导航:首页 > 矿机挖矿 > 挖矿翻译

挖矿翻译

发布时间:2021-04-11 02:22:20

❶ 救命啊。英语翻译,关于采矿的

下载一个,有道翻译官软件,或者网络拍照翻译

❷ 采矿专业翻译

中等深度钻孔空场采矿法
短孔留矿回采法

open stoping
空场采矿法
shrinkage stoping
仰采留矿回采法

shrinkage stoping
留矿回采

shrinkage stoping
留矿回采

shrinkage stoping
仓储采煤法
急斜煤层中将采落的煤暂留于已采空间中,待仓房内的煤体采完后,再依次放出存煤的采煤方法。

shrinkage stoping
留矿采矿法

shrinkage stoping
留矿采矿法

❸ 采矿英语翻译

This design altogether nine chapters, respectively are the general remarks, the technical economy, the mining geology, mining, the mining slope ramp design, the mine ventilation design, the mining machinery, the assembly drawing transportation, safe specially. And mining, the mining machinery, the mining slope ramp project are the design main bodies, in mining used advanced low poor has damaged the non-lower column partition to come down the law, will have the huge economic efficiency, the special mining slope ramp project, mainly included the slope ramp position the determination, the slope ramp form choice, the slope ramp cross section specification, the slope ramp slope, slope ramp aspect and so on curve design, slope ramp construction contents. Some parts of designs contain the essential blueprint, the blueprint must defer to the concerned requirements plan.

❹ 采矿用英语怎么说

您好!
很高兴为你翻译、解释。您提出的采矿用英语怎么说?

只有专业说法:mining(汉字注音:埋岭)最准确。(汉语含义:n.采矿, 矿业)可做动名词。
英语的其他表达方式均不能准确地表达“采矿”的动名词。

例如:mine pron.我的;n.矿, 矿山, 矿井, 源泉, 宝库, 地雷, 水雷;vt.挖掘, 开采, 在...布雷, 破坏
vi.开矿, 埋设地雷等,只适合做“开矿”的动词

希望我的翻译、解释对你有帮助,祝你心想事成!

❺ 采矿专业 英语翻译

本设计是达茂铁矿露天开采的工艺与开拓设计,年产量200万吨。This opencut exploitation and pioneer design is applied to Damao Iron Mine, with an annual output of approximately 2 million tons.
采用境界剥采比不大于经济合理剥采比的原则圈定露天开采境界。Open-pit boundary is contoured with the application of the rule of boundary stripping ratio less than or equal to economic stripping.
并进行可采储量及平均剥采比的计算。And make a caculation of proved reserves and average stripping ratio.

用矿山延伸速度验证生产能力。Throughput is verified by extension rate of the mine.

编制露天矿采掘进度计划时,平均剥采比乘系数的方法初定生产剥采比,电铲的效率根据类似矿山选取。 When working out the open-pit excavation schele, proction stripping ratio is initially decided by the approach of average stripping ratio mutiplied by coefficient while efficiency of electric shovel selected on the basis of similar mines.
本矿采用斜坡汽车螺旋坑线开拓。 The mine is exploited by vehicles along the slope of the spiral pit-line.
工艺部分包括穿孔设备选型及其数量的计算、电铲设备的选型及其数量的计算、汽车数量的计算及选型、推土机选型及数量计算、辅助设备的选型及数量的计算等。Techniques include the selection and caculation of drilling equipments,electric shovels,vehicles,bulldozer as well as assistant auxiliary equipments.
爆破方法是选择及药量计算,运输调车方式是选择,排土方法的选择及排土计算。 Blasting method is the selection of dosage and caculation;shunting method is the selection as well as the selection of mping and and mping caculation.
关键词:露天开采 开拓 工艺 采掘进度计划
Key words: open-pit exploitation;excavation;techniques;excavation schele

同学,累死我了;一个多小时翻译的你的这篇文章,^_^。

❻ 英语采矿翻译decline

你好!
在这里我把decline所有的意思都给到你吧,你再去配,总会有一个意思是你所想的
n.下降,衰退,斜面
vi.下降,衰落,谢绝
vt.谢绝,婉拒
如:in decline 下降,在衰退中
proction delcline (在油气,矿业,经济行业中)产量递减
decline trend 递减趋势
谢谢,希望能够帮到你!!

❼ 急求采矿专业英语翻译

6.1
Rock
Mass
Classification
6.1岩石分级
1.Introction介绍
During
the
feasibility
and
preliminary
design
stages
of
a
project,
when
very
little
detailed
information
is
available
on
the
rock
mass
and
its
stress
and
hydrologic
characteristics
,the
use
of
a
rock
mass
classification
scheme
can
be
of
considerable
benefit.
在一个项目的可行性和初级设计阶段,当获得有关岩体和水文特性的资料非常少的时候,那么一本岩石分级方案是相当大的益处.

❽ 采矿专业英语翻译

开采活动与各中段设备的标准化与专业化(下部中段或开拓中段,上部中段或生产开采中段),与无轨运输系统共同创造了极大的灵活性。

❾ 采矿翻译

我问的我英语专八在英文报社工作的同学,他说第一句是在一座山脉中,第二句是这座山脉被分成了几个区域,sequence是连续的意思,你要是给点上下文可以更清楚

❿ 采矿专业英文翻译

The Ge Ting coal mine is that Zi Bo City Bureau of Mines develops the third pair of the northwest part modernizing a shaft , being located in Shandong Province Ji Ning City building in helping north mining area. The shaft year designs 600,000 tons of efficiency , design the length of service 51. The shaft may cut coal being 3 coal , 16 coal , 17 coal tier mainly , the host mines 3 coal seams. The village , highway pressure coal are grave and , 3 coal seam length of service shortens since shaft geology condition is complicated,be prolong the shaft length of service, decide to exploit 16 , 17 coal, coal matches spirit with 3. And design that condition considers the queen synthetically , put forward opens up a scheme by the geology general situation , well-field range , reserves and 16 , 17 coal seam geology to well-field originally , push and big alleys by the fact that the economy technology ascertains the tie making use of 130 orbits to go up the hill preparing adhesive tape going up the hill comparatively going up the hill exploiting, the mining area being in progress to 1160 mining area designs that. By the analysis to 1160 mining area geology condition, the for sure adopt long unitary make for wall coal mining law , single wing exploits, coal mining handicraft has adopt top grade Pucai , has adopt all caving law to manage a roof, driving face adopt a cannon dig. And carry out equipment choosing a type , arrange turn out system after ascertaining the mining area parameter, work out safe technology measure. Keywords: Well-field opens up , mining area , make for increase wall coal mining law , top grade Pucai

阅读全文

与挖矿翻译相关的资料

热点内容
lrls数字货币 浏览:883
挖矿显卡算力什么 浏览:779
2009年比特币有多少 浏览:862
7990eth算力 浏览:941
btc受美股影响 浏览:166
akoex虚拟货币 浏览:217
比特币盯盘闹钟 浏览:392
数字货币celr 浏览:707
虚拟货币估价 浏览:106
虚拟货币的主网有哪些 浏览:955
比特币披萨的价值 浏览:538
为什么比特币没有应用场景 浏览:708
对杠杆来说怎样算竖直力 浏览:503
比特币如何备份钱包 浏览:289
虚拟货币图标怎么看 浏览:570
帮别人注册比特币账号 浏览:212
虚拟货币抢茅台 浏览:145
安利btc中的收获 浏览:842
虚拟货币里的白银 浏览:421
mxm极矿币初级矿池 浏览:473